Size:80m x 25m x 6m
Area: 2000sqm
Warehouse layout: front shop and back warehouse
Item No.:
Gg-48Payment:
T/T & L/CProduct origin:
Hebei, ChinaShipping port:
TianjinLead Time:
about 30 daysPrice:
30-50 usd/sqmThe steel structure warehouse size: 80m x 25m x 6m, roof height 8 meters.
This building is a front store and back warehouse model, the front and sides are glass curtain walls,the glass curtain wall uses square tubes as the keel, and the glass is double-layer hollow glass.
Brick walls are used in the warehouse, and the height of the brick walls is 3 meters.No need to use a crane.
According to customer requirements, the top and wall panels are green colored steel veneers.
The overall effect chart is as follows:
The rear warehouse requires trucks to enter and exit, so the warehouse is equipped with doors: 5 sets of 2m x 3m electric rolling doors.
The shop in front only requires people to enter and exit. Therefore, the glass curtain wall is equipped with doors: 5 sets of 1.5m x 2m PVC swing doors.
Between the shop and the warehouse, there are also five 1.5m x 2m PVC swing doors.
Internal layout drawing 1
Internal layout drawing 2
Steel structure production process
Our company has just optimized the product production line, adopted advanced production machines, simplified the production process, improved production efficiency, and will never delay the construction period under the condition of quality and quantity.
1. Production of main steel components
Using automated equipment, the steel plate is cut into main steel components, with an error of ±2mm;
2. Production of small piece
The automatic machine automatically aligns the plate for drilling, the deviation is less than or equal to 1mm, to ensure 100% installation without error
3. Assembling, submerged arc welding, straightening of section steel
Combine the three processes of assembly, submerged arc welding, and correction to improve production efficiency, and the finished product error is ±2mm
4. All component numbers
All components are numbered and marked with numerical values and letters, which saves time for later production processes and improves production efficiency.
5. Cut the marked section of steel
This step is to cut the marked section of steel, using infrared scanning, the error range is within 2mm, and the cutting edge is smooth and beautiful, which is convenient for later welding.
6. Assemble
Assemble all the connection boards and perform local spot welding with electric welding; check the dimensions to ensure that the dimensions of each component conform to the drawings.
7. Secondary welding
Weld all the connecting parts of the assembly process firmly, and cross the assembly process, with high productivity and fast welding efficiency.
8. Shot blasting and rust removal
Through the impact and cutting action of the spraying material on the profiled steel, the surface rust of the profiled steel is removed to increase the roughness, and artificial slag removal treatment is also performed, which makes a very good preparation for the spray paint, enhances the adhesion of the coating and the profiled steel, and prolongs the Durability of the coating film.
9. Spray paint
Spray paint according to the drawings and customer requirements, and spray 4 times. After the completion, the surface of the component will not sag, no bubbles, no cracks, and the color is uniform and beautiful.
10. Composite board veneer production
On average, each machine can produce 2,000 square meters a day; veneer production machines: we have 6 machines, which can produce 10,000 meters a day.
11. C section steel production
CNC C-shaped steel production machine, first punching, then bending, and then cutting, no burrs and no sticking, high production efficiency, can produce 5,000 meters a day.
12. Accessories production
FAQ
Q1: You are manufacture factory or trading company?
A: We are direct manufacture for steel structure buildings. we have rich experiance of steel structure designing,manufacturing, processing and installation.
Q2: Is your price competitive with other companies?
A: Our business goal is to give you the best price with same quality and best quality with the same price. We will try our best to reduce your cost.
Q3: Do you offer service for installation?
A: We will give detailed installation drawings and video for free. And if you need, we could send engineers as installation director even a team.
Q4: Do you accept container loading inspection?
A: You are welcomed to send an inspector, not only for the container loading, but any time during the production time.
Q5: Do you offer designing service for us?
A: Yes, we have experienced design team,and we can design full solution drawings as your requirements.
Q6: What is the delivery time?
A: Delivery time depends on order quantities. Generally, the delivery time will be 30 days after receiving deposit.
Q7: How can you get a quotation for your projects?
A: You can chat with us anytime or you can just fill out our questionnaire and send back to us. We will give you the best quotation asap.
Previous :
Somalia steel structure two-story shopping centerNext :
Ethiopian steel structure two-story office buildingIf you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
Categories