Size : 32m x 50m x 8m
Area : 1600sqm
Item No.:
Gg-37xgPayment:
T/T & L/CProduct origin:
Hebei, ChinaShipping port:
TianjinLead Time:
about 30 daysPrice:
30-50 usd/sqmProduct specifications
Steel structure building is made of the main framework with H beam, C purlin or Z purlin. Roof and wall use variety of panels together with other components such as windows and doors. Steel structure building has the advantages of wide span, high strength, light weight, low cost, temperature protection, save energy,beautiful appearance, short construction time, good effect of insulation, long using life, space efficient, good seismic performance, flexible layout, etc.
Product name |
Multi-layer steel structural stadium building steel materials construction |
Column and beam | H beam steel |
Purlin |
C/Z section steel |
Wall & roof material |
50/75/100/150mm EPS/PU/rockwool/fiberglass sandwich panel |
Connect |
Bolt connect |
Window |
PVC or aluminum alloy |
Door |
electrical shutter door/sandwich panel door |
Certification |
ISO9001/CE |
Material show
Sandwich panels are mainly used in buildings that require heat preservation and heat insulation. The sandwich panel’s core materials mainly include polyphenylene, polyurethane foam, rock wool, and glass wool.
The roof and wall panels are to ensure a normal and safe production environment in the workshop. It forms a wind load that bears and transmits the wall’s weight through the foundation, wall girt, and wind-resistant columns, and the wind load acts on the wall.
The frame structure system is composed of horizontal and vertical plane frames. As the basic load-bearing structure of the steel structure workshop, the horizontal plane frame is significant. It is composed of a foundation, roof beams, and steel columns.
Steel structure production process
Our company has just optimized the product production line, adopted advanced production machines, simplified the production process, improved production efficiency, and will never delay the construction period under the condition of quality and quantity.
1. Pre-production meeting: Discuss project requirements and execution standards, ensuring customer’s demands are accurately forwarded to the production line.
2. Production drawings: With quality requirements and process standards.
3. Raw Material Inspection: Rigorous inspection of raw materials ensures qualified products entering the factory.
4. CNC flame cutting and slicing:High Precision and high production efficiency make the steel cutting amount per day up to 150-200 tons.
5. H-Beam Spot Welding and Assembly: Assembled welded and corrected in a streamlined process with a production rate of approximately 25 meters per hour.
6. Intelligent Steel Marking Robot: Smart operation for precise line marking.
7. Intelligent Steel Cutting Robot: Infrared ray scans marking, accurate cutting. Perfect finish, efficient cuts up to 50 tons.
8. Small Plates Fabrication: Automated CNC machines, ensuring high-speed, accurate drilling to guarantee error-free installation.
9. Assembly: Connected plates are assembled and welded on H beam, Cross work maximize welding efficiency.
10. Shot Blasting: Sa 2.5 grade clean rust and enhance coating adhesion, extend life usage.
11. Semi-Finished Product Inspection: 100% quality inspection to ensure product compliance.
12. Painting: Four coats of paint , ensuring a smooth, bubble-free, crack-free, and uniform surface finish.
13. Product Coding: Every steel structure part is clearly coded according to installation drawings, ensuring smooth installation.
14. C-Steel Production: CNC programming ensure smooth, high-efficiency production, yielding 5,000 meters daily.
15. Single Panel Production: Six machines produce 10,000 meters daily, high efficiency.
16. Composite sandwich Panel: High-speed production of 2,000 meters daily.
17. Bending: Accessories and gutters for the entire facility are fabricated here.
18. Finished Product Inspection: Goods can not be allowed to be packed until getting the approval by QC Authorities.
19. Storage: Qualified products are categorized and stored in the yard, to keep the goods are clean, dry and ventilated.
20. Packaging: packed with steel crates, save shipping container.
21. Pre-loading Inspection: Quantity and appearance inspections are conducted before loading, ensuring customers can receive the perfect goods.
Then, you can wait to receive your shipment.
If your steel structure project needs to be constructed, please feel free to contact us, we will design the best solution for you according to your project needs, and give you the best quotation.
Previous :
Prefab Steel Structure Warehouse buildingNext :
Algeria Steel Structure Flour Mill buildingIf you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
Categories