The
3000-square-meter steel structure warehouse sent to Manila, Philippines begun to packing.
Our factory workers packed the beams, columns, purlins and wall panels.
The package is completed, and it is time to load into containers, and the goods need to be packed into 40HQ shipping containers.
After the loading completed, the goods are transported by large trucks to Tianjin port, where they are loaded on ships and transported to the Philippines.