Size:80m x 25m x 6m
Area: 2000sqm
Warehouse layout: front shop and back warehouse
Item No.:
Gg-54Payment:
T/T & L/CProduct origin:
Hebei, ChinaShipping port:
TianjinLead Time:
about 30 daysPrice:
30-50 usd/sqmThe steel structure warehouse size: 80m x 25m x 6m, roof height 8 meters.
This building is a front store and back warehouse model, the front and sides are glass curtain walls,the glass curtain wall uses square tubes as the keel, and the glass is double-layer hollow glass.
Brick walls are used in the warehouse, and the height of the brick walls is 3 meters.No need to use a crane.
According to customer requirements, the top and wall panels are green colored steel veneers.
The overall effect chart is as follows:
The rear warehouse requires trucks to enter and exit, so the warehouse is equipped with doors: 5 sets of 2m x 3m electric rolling doors.
The shop in front only requires people to enter and exit. Therefore, the glass curtain wall is equipped with doors: 5 sets of 1.5m x 2m PVC swing doors.
Between the shop and the warehouse, there are also five 1.5m x 2m PVC swing doors.
Internal layout drawing 1
Internal layout drawing 2
Our steel structure has a wide range of uses. In addition to shopping malls, it can also be used as warehouses, workshops, production workshops, office buildings, exhibition halls, etc. As long as you have any needs, please feel free to contact us.We have professional designers who can provide you with free design solutions according to your requirements.
Steel structure production process
Our company has just optimized the product production line, adopted advanced production machines, simplified the production process, improved production efficiency, and will never delay the construction period under the condition of quality and quantity.
1. Production of main steel components
Using automated equipment, the steel plate is cut into main steel components, with an error of ±2mm;
2. Production ofsmall piece
The automatic machine automatically aligns the plate for drilling, the deviation is less than or equal to 1mm, to ensure 100% installation without error
3. Assembling, submerged arc welding, straightening of section steel
Combine the three processes of assembly, submerged arc welding and correction to improve production efficiency, and the finished product error is ±2mm
4. All component numbers
All components are numbered, marked with numerical values and letters, which saves time for later production processes and improves production efficiency.
5. Cut the marked section steel
This step is to cut the marked section steel, using infrared scanning, the error range is within 2mm, the cutting edge is smooth and beautiful, which is convenient for later welding.
6. Assemble
Assemble all the connection boards and perform local spot welding with electric welding; check the dimensions to ensure that the dimensions of each component conform to the drawings.
7. Secondary welding
Weld all the connecting parts of the assembly process firmly, and cross the assembly process, with high productivity and fast welding efficiency.
8. Shot blasting and rust removal
Through the impact and cutting action of the spraying material on the profiled steel, the surface rust of the profiled steel is removed to increase the roughness, and artificial slag removal treatment is also performed, which makes a very good preparation for the spray painting, enhances the adhesion of the coating and the profiled steel, and prolongs the Durability of the coating film.
9. Spray paint
Spray paint according to the drawings and customer requirements, and spray 4 times. After the completion, the surface of the component will not sag, no bubbles, no cracks, and the color is uniform and beautiful.
10. Composite board veneer production
On average, each machine can produce 2,000 square meters a day; veneer production machines: we have 6 machines, which can produce 10,000 meters a day.
11.C section steel production
CNC C-shaped steel production machine, first punching, then bending, and then cutting, no burrs and no sticking, high production efficiency, can produce 5,000 meters a day.
12.Accessories production
FAQ