Size : 24m x 66m x 7m
Area : 1584sqm
Item No.:
Gg-39Payment:
T/T & L/CProduct origin:
Hebei, ChinaShipping port:
TianjinLead Time:
about 30 daysPrice:
30-50 usd/sqmProduct specifications
Steel structure buliding is made of the main framework with H beam, C purlin or Z purlin. Roof and wall use variety of panels together with other components such as windows and doors. Steel structure building has the advantages of wide span, high strength, light weight, low cost, temperature protection, save energy,beautiful appearance, short construction time, good effect of insulation, long using life, space efficient, good seismic performance, flexible layout, etc.
Product name |
Multi-layer steel structural stadium building steel materials construction |
Column and beam | H beam steel |
Purlin |
C/Z section steel |
Wall & roof materila |
50/75/100/150mm EPS/PU/rockwool/fiberglass sandwich panel |
Connect |
Bolt connect |
Window |
PVC or aluminum alloy |
Door |
electrical shutter door/sandwich panel door |
Certification |
ISO9001/CE |
Steel structure production process
Our company has just optimized the product production line, adopted advanced production machines, simplified the production process, improved production efficiency, and will never delay the construction period under the condition of quality and quantity.
1. Production of main steel components
Using automated equipment, the steel plate is cut into main steel components, with an error of ±2mm;
2. Production ofsmall piece
The automatic machine automatically aligns the plate for drilling, the deviation is less than or equal to 1mm, to ensure 100% installation without error
3. Assembling, submerged arc welding, straightening of section steel
Combine the three processes of assembly, submerged arc welding and correction to improve production efficiency, and the finished product error is ±2mm
4. All component numbers
All components are numbered, marked with numerical values and letters, which saves time for later production processes and improves production efficiency.
5. Cut the marked section steel
This step is to cut the marked section steel, using infrared scanning, the error range is within 2mm, the cutting edge is smooth and beautiful, which is convenient for later welding.
6. Assemble
Assemble all the connection boards and perform local spot welding with electric welding; check the dimensions to ensure that the dimensions of each component conform to the drawings.
7. Secondary welding
Weld all the connecting parts of the assembly process firmly, and cross the assembly process, with high productivity and fast welding efficiency.
8. Shot blasting and rust removal
Through the impact and cutting action of the spraying material on the profiled steel, the surface rust of the profiled steel is removed to increase the roughness, and artificial slag removal treatment is also performed, which makes a very good preparation for the spray painting, enhances the adhesion of the coating and the profiled steel, and prolongs the Durability of the coating film.
9. Spray paint
Spray paint according to the drawings and customer requirements, and spray 4 times. After the completion, the surface of the component will not sag, no bubbles, no cracks, and the color is uniform and beautiful.
10. Composite board veneer production
On average, each machine can produce 2,000 square meters a day; veneer production machines: we have 6 machines, which can produce 10,000 meters a day.
11.C section steel production
CNC C-shaped steel production machine, first punching, then bending, and then cutting, no burrs and no sticking, high production efficiency, can produce 5,000 meters a day.
12.Accessories production
This is our accessory production area, all accessories for the entire project are produced here
13. Freight Yard
All produced goods will be packed, boxed and shipped here
Installation
1.To provide product installation drawings and video, if you have special requirements, we also have engineers to guide the installation.
It is very easy to assemble and disassemble, you can install the house just like playing the Block Game. One worker can assemble 40-50 square meters in 8 hours, also you can build the house just follow our video.
2. if have any problems, we will promptly give a reasonable solution 24 hours.
FAQ
Q1: You are manufacture factory or trading company?
A: We are direct manufacture for steel structure buildings. we have rich experiance of steel structure designing,manufacturing, processing and installation.
Q2: Is your price competitive with other companies?
A: Our business goal is to give you the best price with same quality and best quality with the same price. We will try our best to reduce your cost.
Q3: Do you offer service for installation?
A: We will give detailed installation drawings and video for free. And if you need, we could send engineers as installation director even a team.
Q4: Do you accept container loading inspection?
A: You are welcomed to send an inspector, not only for the container loading, but any time during the production time.
Q5: Do you offer designing service for us?
A: Yes, we have experienced design team,and we can design full solution drawings as your requirements.
Q6: What is the delivery time?
A: Delivery time depends on order quantities. Generally, the delivery time will be 30 days after receiving deposit.
Q7: How can you get a quotation for your projects?
A: You can chat with us anytime or you can just fill out our questionnaire and send back to us. We will give you the best quotation asap.
Previous :
Algeria Steel Structure Flour Mill buildingNext :
Ethiopian bottled water production workshopIf you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
Categories