Stable expandable shelter house
Item No.:
Yyf-1Payment:
T/T & L/CProduct origin:
Hebei, ChinaShipping port:
TianjinLead Time:
about 30 daysDetails display
Technical Parameter |
Camping house |
Maximum range |
Unfolded Size |
L6.058m x W5.54m x H2.896m |
/ |
Folded size |
L6.058m x W1.218m x H2.896m |
/ |
Insulation coefficient |
Normal value 0.26W/(m x k) |
0.266W/(m x k) |
Anti-seismic |
Normal value level 12 |
Level 13 |
Wind resistant |
Normal value level 13 |
Level 15 |
Panel |
Polyurethane |
/ |
Panel thickness |
75mm +aluminum plate |
/ |
Qty/Cntr |
Direct boarding |
/ |
Product application
Camping house is widely used in all situation, such as office, meeting room, shelter, hospital,command room and so on. In addition, the house layout can be customized according to your requirements. Besides, it is easy to install , it could be directly use when it arrived to the site.
FAQ
1. How Long does it take to build a prefab house?
A: It depends on the size of the house. Generally, the construction period is around 3 days of a house by a construction team with 3-5 people. And just one day is enough to build the steel structure frame.
2. Would you send engineers to the site to guide for working when installed?
A:Yes, usually we will send one experienced engineers to the site.
3. How Long does it take to produce the hosue?
A: About 20-30 days accordingly.
4. What kind of things you would offer for prefab house?
A: Usually, we offer all house building need material. Besides, we can offer the bathroom (Toilet, washbasin, showeroom) and kitchen room (Cabinet, vegetable sink),and if you need other furnitures, we can help purchase too.
5. Does this kind of house can only be used in residential building?
A: Absolutely not. it can be used as hotel, office, school, aeprtment, shelter, ect.
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
Categories