Steel warehouse and prefabricated house manufacturer
Products
Home

Warehouse and Workshop

High quality steel garment processing plant building

High quality steel garment processing plant building

Multi applications steel structure buildings manufacturer

  • Item No.:

    Gg-15xg
  • Payment:

    T/T & L/C
  • Product origin:

    Hebei, China
  • Shipping port:

    Tianjin
  • Lead Time:

    about 30 days
  • Price:

    30-50 usd/sqm
  • Product Details

We are a steel structure manufacturer from China, specializing in exporting for nearly 20 years. We mainly produce steel structure industrial plants, warehouses, workshops, multi-storey commercial buildings, agricultural breeding and other fields. 


If you want to build a garment factory, you can also find us.

Here are a few issues that need to be paid attention to in the production workshop of a garment factory:


Space division: 

The internal space division of the factory is based on the rational use of space based on the actual needs of the operators themselves.

1. If there are many equitments in the factory area, it is not advisable to set too many partitions and partition walls. Try to use the color of the ground or use some colored Use the logo to divide the area. Use the logo to divide the area to avoid too many colors, so that not only the area division is not obvious, but the lover will feel dizzy.
2. The equipment area and office area can be clearly divided so that it is easy to manage. A partial two-story office can be set up inside the plant.
3. Generally, clothing factories are relatively densely staffed. To make employees feel comfortable, lighting needs to be considered.

Top design:
1. The top of the factory building is usually high, When decorating the top, you must first design reasonable arrangements for fire protection, ventilation, and central air conditioning, because these are necessary for the decoration of the factory. Hardware facilities, especially fire fighting.
2. Customers can also choose whether the factory building needs a ceiling. There are many materials for the factory ceiling, which can be determined according to the actual situation. 
It is also possible not to make any suspended ceilings, and to partially decorate some facilities that need to be hidden or unsightly on the top.


Ground design:
1. The decoration of the factory should also consider the ground part. Generally, the decoration of the plant does not need to carry the load, so you can consider using some high-quality and inexpensive decoration materials. 
2. In some workshops, anti-static should be considered when decorating, and anti-static flooring should be selected as decoration materials; this can be decided according to the actual needs of the product and other aspects.


The above is just a list of some of the issues that need to be paid attention to in the garment factory. If you want to suggest a carton production workshop, you don’t know how to design the production workshop. It doesn’t matter. We have professional designers who will meet your specific needs. We will design a reasonable plan for you, and we will consider all the problems for you. 


If you have any needs, plz contact us at any time.


FAQ

Q1: Are you a manufacturing factory or trading company?
A: We are the direct manufacture of steel structure buildings. we have rich experience in steel structure designing, manufacturing, processing, and installation.

Q2: Is your price competitive with other companies?
A: Our business goal is to give you the best price with the same quality and the best quality with the same price. We will try our best to reduce your cost.

Q3: Do you offer service for installation?
A: We will give detailed installation drawings and videos for free. And if you need, we could send engineers as installation directors even a team.

Q4: Do you accept container loading inspection?
A: You are welcomed to send an inspector, not only for the container loading but any time during the production time.

Q5: Do you offer designing service for us?
A: Yes, we have an experienced design team, and we can design full solution drawings as per your requirements.

Q6: What is the delivery time?
A: Delivery time depends on order quantities. Generally, the delivery time will be 30 days after receiving the deposit.

Q7: How can you get a quotation for your projects?
A: You can chat with us anytime or you can just fill out our questionnaire and send it back to us. We will give you the best quotation asap.

Leave A Message

If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.

related products
steel structure storage warehouse manufacturer
Prefabricated light steel structure storage warehouse buildings

Direct manufacturer for steel frame warehouse

prefabricated steel structure workshop
Large span weld H beam prefabricated steel structure workshop

customized steel workshop construction building

light metal frame building design
Light metal frame building prefab welded steel material structure workshop

prefabricated galvanized steel structure production workshop

construction steel material warehouse
Modern prefabricated construction steel structure material warehouse

prefab warehouse steel structure warehouse industrial steel structure

steel logistics warehouse
Somalia steel logistics warehouse project

Size: 26mx50mx8m Area: 1300sqm

steel warehouse
Prefab Steel Structure Warehouse

large span prefab steel structure warehouse buildings

steel structure warehouse
Steel warehouse building storage sheds house

Metal steel structure frame building manufacturer

Steel warehouse
Prefabricated construction steel warehouse

Steel warehouse building from China

© Copyright: 2024 Hebei Baofeng Steel Structure CO.,LTD All Rights Reserved.

IPv6 network supported

top

Leave A Message

Leave A Message

    If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.