Prefabricated 20ft expandable container house
Item No.:
Kzf-22Payment:
T/T & L/CProduct origin:
Hebei, ChinaShipping port:
TinajinLead Time:
about 30 daysPrice:
17500-19500 usd/setProduct specification
Technical Parameter |
Maximum range |
|
Unfolded size |
L5.9m x W6.4m x H2.54m |
/ |
Folded size |
L5.9m x W2.28m x H2.54m |
/ |
Insulation coefficient |
Normal value 0.032W/(m x K) |
0.033W/(mxk) |
Anti-seismic |
Normal value level 9 |
Level 11 |
Wind resistant |
Normal value level 11 |
Level 13 |
Panels |
EPS/PU |
/ |
Panel thickness |
50mm |
/ |
Qty/Cntr |
2 sets in a 40 HQ |
/ |
Product introduction
Expandable container house is widely used in all situations, such as office, living room, meeting room, dormitory, shop, toilet, storage, kitchen, shower room, and so on. In addition, the house layout can be customized according to your requirements. Besides, we can change the layout by an add a partition wall and facilities like a toilet, it could be directly used when it arrived at the site.
Production process
1. Design: Design according to customer requirements.
2. Structure cutting: According to the drawing requirements, the machine cuts the material with high accuracy and smooth cuts.
3. Small plates assembly: Weld the connecting plates sturdy and firm with high production efficiency and fast welding.
4.Riveting welding of structure: Welding shall be carried out according to the drawing requirements, and the product components shall be firm, tight, and stable, with high impact resistance, corrosion resistance, seismic resistance, and strong weather resistance.
5. Polishing and painting: Remove floating rust on the surface of the steel to increase roughness, so as to enhance the adhesion between the coating and the profile steel, and prolong the durability of the coating film.
6. Painting: Appearance is required to be even and nice with no sagging, bubbles and cracks on the surface .
7. Production of panel: According to customer requirements and drawings, use machine to operate with accurate size, beautiful appearance and durable quality.
8. Inspection: It will be done according to customer needs and drawings.
9. Production of C-shaped steel: CNC programming is used to set the hole spacing and length, and there is no burrs or binding. With high production efficiency, output is up to 5000m/day.
10.Production of composite panel : With fast production efficiency, we can produce 2000 meters per day.
11. Production of flashing: The machine is programmed and can achieve multi-automatic operation to complete one-step parts processing, to improve production efficiency.
12. Pre-assembly: Pre-assembly is carried out in the factory to ensure that the house will be installed well.
13. Finished goods storage: Maintain and inspect the finished products. We will inspect the completeness, clean them and check the list 7 days before shipment.
14. Packaging: All items will be put inside of the house, and the outside will be wrapped with a plastic film to ensure that there are no collisions during transportation and the goods are safe.
15. Loading: Before loading, the track is welded and the goods are pushed into the container. Then, the container and goods are fixed to ensure safety during transportation. During unloading, the goods are pulled out along the track, which can save time and labor.
Advantage
1. The area will be decreased 20% of the total area after being folded. It will cut a lot freight fees.
2. EPS/PU sandwich panel used for the out wall materials,good insulation proof and heat insulation performance.
3. Steel structure make the house resisting heavy wind and 7 grade earthquakes.
4. The beautiful appearance, all the color of the wall roof and steel can be customized.
5. 1 set be installed only need 15 minutes by 4 workers.
6. Anti worm and ant. All the steel structure is painted and anti-rust which can be normally used for more than 12 years without any building garbage.
FAQ
1. How Long does it take to build a prefab container house?
A: It depends on the size of the house. Generally, the construction period is around 3 days of a house by a construction team with 3-5 people. And just one day is enough to build the steel structure frame.
2. Would you send engineers to the site to guide for working when installed?
A:Yes, usually we will send one experienced engineers to the site.
3. How Long does it take to produce the house?
A: About 20-30 days accordingly.
4. What kind of things you would offer for prefab house?
A: Usually, we offer all house building need material. Besides, we can offer the bathroom (Toilet, washbasin, showeroom) and kitchen room (Cabinet, vegetable sink),and if you need other furinitures, we can help purchase too.
5. Does this kind of house can only be used in residential building?
A: Absolutely not. it can be used as hotel, office, school, apartment, shelter, etc.
Previous :
China ready made modular prefabricated 20ft expandable container house with 2 bedroomsNext :
Prefabricated 20ft movable foldable modular expandable home houseIf you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
Categories