Short construction period steel arched shed
Item No.:
Gxp-01Payment:
T/T & L/CProduct origin:
Hebei, ChinaShipping port:
TinajinLead Time:
about 30 days
6. High flexibility: Small-span buildings can be directly installed manually no matter where the building is located, and the installation can be completed without any equipment.
Product installation
1. First set the foundation template according to the size to pay off and fix it.
2. Then insert the assembled steel frame into the foundation template one by one, and fix it with bolts.
3. Install the gable board between the building and the foundation template according to the size. During installation, the gable panels need to be cut according to the curvature of the building.
4. At the interface of the gable part, the edging shall be fixed with self-tapping nails.
5. The accessory edging of the door and window part should be fixed with self-tapping screws or rivets.
Previous :
Steel structure beamless arch shedNext :
Multi-span film greenhouses for vegetables plantingIf you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
Categories