Prefab light steel structure shopping mall
Item No.:
Gg-08Payment:
T/T & L/CProduct origin:
Hebei, ChinaShipping port:
TianjinLead Time:
about 30 daysPrice:
30-50 usd/sqmProduct Description
The materials of Steel structure warehouse building as follows:
The main structure (including steel columns and beams) is welded by H-shaped steel.
The steel column is connected to the foundation through the embedded anchor bolts.
Beam and column, beam, and beam are connected with high-strength bolts.
Roof purlins and wall beams are made of galvanized C or Z steel.
Bracing systems used to increase the stability of the workshop, including roof supports, wall supports and beams.
The walls and roof are made of color steel plates or color steel sandwich panels connected with roof purlins and wall beams by self-tapping nails.
ADVANTAGES
(1) Free design and architectural drawings provided;
(2) Durability, easy maintenance, designed life span for 50 years;
(3) Fast and easy assemble, online installation guidance provided;
(4) Elaborate and strong design, high wind ressistance performance;
(5) Thermal and noise insulation, water proof and fire prevention.
Packing and shipping
Our patented packaging method enables us to load over 10 containers per day. Minimize packaging costs for our clients, significantly reduces unloading time and labor. Typically, unloading can be completed within an hour, saving both time and effort.
If you need to build steel structure projects, pls contact us.
Previous :
Customization prefabricated steel structure motorpool shedNext :
Easy assembled multiple floor prefab steel frame building for shopping mallIf you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
Categories