Influencing factors of steel structure price
For the vast majority of customers, when building a large project such as a steel structure warehouse or workshop, price is their first consideration, and it is most appropriate to be able to get high-quality products at a relatively favorable price.
So, what factors affect the cost of steel structures?
1. Material is the main factor affecting the price
The main body of the warehouse and workshop is the frame composed of steel structure, which accounts for about 70%-80% of the total cost of the steel structure project. The fluctuation of the market price of raw materials will directly affect the cost of the steel structure project. Depending on the material and thickness of the section steel, the material, and the thickness of the cover plate, the price will also be different.
2. Design also affects the price to a large extent
The design of steel structure project is designed by a professional designer, so as to make the warehouse plan reasonable. A reasonable design scheme can save raw materials and control project costs. Different design schemes are an important reason for the change in the value of raw materials, and directly affect the total cost of construction.
3. The length of the construction period is another factor that affects the cost of the steel structure. The longer the construction time, the higher the natural engineering cost.
We have professional designers to provide you with reasonable solutions. If you need to build a steel structure project, you can contact us at any time.