Steel warehouse and prefabricated house manufacturer
Products
Home

Warehouse and Workshop

Prefab warehouse project steel structure buildings

Prefab warehouse project steel structure buildings

Multifunctional steel structure building

  • Item No.:

    Gg-05xg
  • Payment:

    T/T & L/C
  • Product origin:

    Hebei, China
  • Shipping port:

    Tinajin
  • Lead Time:

    about 30 days
  • Price:

    30-50 usd/sqm
  • Product Details

Product specifications

Steel structure warehouse building is sturdy and durable and can withstand high winds, snow, or earthquakes. Our structural engineers design the building structure according to the local wind and snow load to ensure that the entire building can withstand the harsh external weather. Compared to concrete buildings, steel structure has many advantages, such as low cost, fast construction, and environmentally friendly. The interior layout of the metal buildings can be fully customized to meet your needs.

Product Usage

The steel structure buildings has been widely used in various situation, such as steel storage warehouse, workshops, conference halls, large shopping malls, exhibition halls, hangar, plant, stadiums and other large public event buildings. It has many advantages as far as the sustainable development is concerned in the modern industry.

Product process

We have been specializing in steel structure design and production of 16 years, rich experience in export trade.
Factory area of 49,000sqm, 60 mid-level technicians, senior technicians 30, the annual output of 1 million tons, the production strength is very strong.
Our products are exported to South America, Southeast Asia, Africa, more than 30 countries and regions, exports experienced, the export volume of 800,000 tons, strong export capacity.

We are direct manufacturer for steel warehouse buildings manufacturer. Production period is about 25-45 days after receipt of advance payment. We will provide installation drawings, installation videos. If necessary, we will have dedicated staffs and engineers to the scene to guide the installation. loading and unloading of our products are convenient. You can use crane in the destination,two people can discharge whole products within half an hour. And definitely won't destroy packaging.

Leave A Message

If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.

related products
steel structure storage warehouse manufacturer
Prefabricated light steel structure storage warehouse buildings

Direct manufacturer for steel frame warehouse

prefabricated steel structure workshop
Large span weld H beam prefabricated steel structure workshop

customized steel workshop construction building

light metal frame building design
Light metal frame building prefab welded steel material structure workshop

prefabricated galvanized steel structure production workshop

construction steel material warehouse
Modern prefabricated construction steel structure material warehouse

prefab warehouse steel structure warehouse industrial steel structure

steel logistics warehouse
Somalia steel logistics warehouse project

Size: 26mx50mx8m Area: 1300sqm

steel warehouse
Prefab Steel Structure Warehouse

large span prefab steel structure warehouse buildings

steel structure warehouse
Steel warehouse building storage sheds house

Metal steel structure frame building manufacturer

Steel warehouse
Prefabricated construction steel warehouse

Steel warehouse building from China

© Copyright: 2024 Hebei Baofeng Steel Structure CO.,LTD All Rights Reserved.

IPv6 network supported

top

Leave A Message

Leave A Message

    If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.