Search
In order to ensure the quality of steel structure products, our company has seven strict production management systems. 1.supply system We have a professional purchasing department, all members of the purchasing department have more than 5 years of work experience and understand the characteristics of varioussteel structure raw materials. 2. Production management system We have strict progres...
In the past, people's buildings were mostly concrete buildings. However, with the passage of time, the earth's resources are decreasing, and the buildings tend to be energy-saving and land-saving. People's acceptance of steel structure buildings is also increasing. So what are the advantages of steel structure buildings? 1. Economical and practical The weight of the steel structure warehouse/...
Steel structure engineering is one of the main types of building structures in modern construction engineering. Because of its lightweight and simple construction, it is widely used in industrial plant warehouses, multi-story commercial buildings, agricultural breeding, and other fields. However, it is not easy to build a steel structure project. According to the different local climates and the a...
Our company is a professional steel structure manufacturer with more than 20 years of production experience. The company has many experienced steel structure designers, who can design a satisfactory steel structure scheme for you according to your requirements. The following are 2 recent steel structure single cases: Steel Structure Project 1 Philippine Steel Structure Warehouse Dimensions: 44m x ...
Container houses are more and more popular because of their advantages of convenient transportation, installation and movement, low cost, long service life and high return on investment. In particular, it can be used as a construction site office, dormitory, labor camp, living room, toilet, etc. The container house can be spliced up, down, left and right into any shape you want. Therefore, if you ...
Hebei Baofeng Steel Structure CO.,LTD founded in 2005, is one of the top professional enterprise that specialized in steel structure designing, manufacturing, processing and installing various steel structure projects,such as steel warehouse, steel workshop, storage warehouse shed, chicken house. churches, prefab houses. We have nearly 20 years of export experience. If you need, we can ship the pr...
If you're a newbie looking to build a 10,000 chicken coop, what questions do you need to consider? First of all, you need to be clear, do you need to raise boiler chickens, layer chickens, or both? In our experience, if you need to raise chickens on the ground(boiler chicken): 18-20 chickens per square meter; If you need caged chickens(layer chicken): 20-25 chickens per square meter; Therefore, th...
Steel structures have long been very common as commercial buildings such as warehouses and factories. In addition, the steel structure can also be used as an office building. Recently, our 3-story steel structure office building project in the Philippines has completed production, and the packaging and delivery tasks of the project have been completed around the Children's Day. Dimensions: 28.36m ...
The production of the more than 2,000 flat chicken coop project in the Philippines has been completed. The packaging work has been carried out 2 days ago (June 7). It has been shipped and the customer will receive the goods soon. Here is the chicken coop project information: Dimensions:14.63m x140.21m x2.4m Area:2051sqm Design load: Wind load: 0.30KN/M2; Roof live load: 0.30KN/M2; Roofdead lo...
Steel structure warehouses, factories and other projects are mostly one- or two-story projects, but if you want a multi-story building, there is no problem. 1. Philippines 4-story steel structure garage packing and shipping Size: 59.2m x 53.22m x 11.55m Area: 3150sqm Packing and Shipping Date: June 11, 2022 More multi-layered projects to showcase: 2.Maldives steel warehouse Size: 50m x 13.8m ...
1)Land:First of all, consider the size and area of your land, you must set aside a part of the area, and the project area cannot occupy all the land area; 2)Leave enough space:Whether it is a warehouse or a production workshop, as the service life increases, there will definitely be more and more goods in it. Therefore, it is recommended that you consider this when planning the plan and leave enou...
4 sets of steel structure chicken coops are loaded and ready to be sent to the Philippines Project Information: Project size: 15.8m x 142m x 1.8m Area: 2243.6sqm Requirements: 4 sets of the same size Time:2022.7.1 If you also need to build any steel structure project, it is best to tell us the following information, or you can consider the following information first, because, in order to better s...
Categories
latest blog
Tags